technical services, inspection & expediting.

Integrated management for critical industrial projects.

Project, construction and site management, with the mechanical, E&I and emergency repair crews to execute it. Inside refineries, process plants and power stations: Oil & Gas, Power, Nuclear.

  • Registered office · Beograd-Grocka, Serbia
  • Italy operations desk · Velletri (RM)
  • EU · China · Middle East

Illustrative P&ID schematic · hover over the equipment

  • ASME VIII Div. 1 / Div. 2
  • PED 2014/68/EU
  • EN 13445
  • ASME B31.1
  • ASME B31.3
  • ASME IX
  • EN ISO 15614
  • EN ISO 9606
  • AWS D1.1
  • EN 1011
  • API 650
  • API 653
  • API 598
  • API 6D
  • API 510
  • API 570
  • ISO 9712 Level 3
  • CSWIP 3.2
  • P91 · 9Cr
  • Duplex 2205
  • Super duplex 2507
  • Inconel 625 / 825

why tsie.

The answers a technical buyer looks for in the first ten seconds.

Coverage, timing, qualifications and independence. Every item below is a commitment we can document, not an adjective.

24/7

Worldwide 24/7

Line open 24 hours a day. Qualified technical response within 6-12 hours of your call.

48H

Rapid mobilization

Crew on site within 24-48 hours in Italy, 48-72 hours in Europe and the Middle East.

ONE

Single point of accountability

Planning, construction, mechanical, E&I and spare parts under one point of contact.

L3

Certified competence

NDT Level 3 (ISO 9712), CSWIP 3.2 welding inspection, work to ASME, API and PED.

IND

Vendor-independent

We do not sell equipment: our technical judgement carries no upstream conflict of interest.

ITER

From ITER to the desert

From nuclear fusion construction sites to Oil & Gas plants in remote areas.

plant lifecycle.

From the first weld to the last spare part.

We cover the whole life of the plant, not just construction. Here is where we step in, phase by phase.

  1. PHASE 1

    Construction

    Day-to-day site management, piping erection to isometrics, supervision of welding and testing.

  2. PHASE 2

    Commissioning

    Point-to-point loop checks, first start-up checks on pumps, punch list and coaching of the client’s staff.

  3. PHASE 3

    Operation & turnaround

    In-service inspection to API 510 and 570, mechanical overhauls, turnaround and shutdown coordination.

  4. PHASE 4

    Plant down

    24/7 line, on-site diagnosis and a technical decision on the repair, documented even in an emergency.

  5. PHASE 5

    Obsolescence

    Reverse engineering and “as for drawing” spare parts for discontinued equipment, with shop testing.

emergency desk.

Plant down?

+39 342 100 1722
info@tsie.net

When critical equipment stops, the cost is not the repair: it is every hour of downtime before it. This service exists to shorten that interval.

Committed timeshours · linear scale 0-96 h
Technical responsefrom your call
6-12
Italyfrom confirmation
24-48 h
Europefrom confirmation
48-72 h
Middle Eastfrom confirmation
48-72 h
Other areascase by case
> 72 h
The line is always reachable; the response comes from a technician able to assess the case, not a switchboard. Mobilization times run from confirmation of the job.

codes & standards.

Which code we work to.

A technical buyer has no use for adjectives. The code is agreed at kick-off, written into the Inspection & Test Plan, and from then on it is the yardstick for accepting or rejecting every activity.

Pressure equipment
  • ASME VIII Div. 1 / 2
  • PED 2014/68/EU
  • EN 13445
Piping
  • ASME B31.1
  • ASME B31.3
Welding · qualification
  • ASME IX
  • EN ISO 15614
  • EN ISO 9606
Welding · execution
  • AWS D1.1
  • EN 1011
Storage tanks
  • API 650
  • API 653
Valves
  • API 598
  • API 6D
In-service inspection
  • API 510
  • API 570
NDT & welding inspection
  • ISO 9712 Level 3
  • CSWIP 3.2

sectors & project types.

Three contexts, three sets of constraints.

Each with its own technical and documentation requirements. The method learned in the strictest one is the one we apply to the others.

Refinery with distillation columns and pipe racks OIL & GAS

Refining and gas treatment

Process plants, including sites in remote areas and high ambient temperatures. This is where logistics, workforce management and spare parts availability weigh as much as technical competence.

POWER

Power generation

Generating plants and their power islands: high-temperature piping, critical valves, integrity of circuits in service.

NUCLEAR · FUSION

ITER

The strictest documentation requirements we have met: full material traceability, procedures approved before every operation, no room for interpretation on acceptance criteria.

We work forEPC ContractorPlant OwnerOEM

our numbers.

Two different figures, both true.

10years in business as a company
20+years of site experience of the founder
~40projects a year
3operating areas: European Union, China, Middle East

Facts, not talk.

TSIE grew out of Riccardo Cherotti’s more than twenty years in heavy industry. We are not a recruitment agency but a technical and management partner for EPC Contractors and Plant Owners: from construction to spare parts management.

RC
Riccardo CherottiFounder & Senior Consultant
Site supervision on a process plant with project documentation

workforce.

We deploy the hands that build your project.

  • Welderscertified on special alloys
  • Pipefittersexperienced with complex isometrics
  • Fittersprecision fitting

Every operator is technically assessed and supervised by a Senior Welding Inspector.

contact us.

You have an applicable code, a piece of equipment and a date.

Tell us and we will confirm feasibility and timing. You will speak to a Technical Manager, not a sales office.