What we do.
Roughly one in five site delays has a technical cause. The rest come from unmanaged interfaces, information that does not reach the right level and decisions postponed because nobody takes responsibility for them.
Our site management work concentrates there. Clashes between disciplines are resolved in a meeting the week before, not in the field on the day with two crews standing idle. The same information is turned into an executable instruction for the foreman, documentary evidence for the QA Manager and progress and risk data for the client.
Safety is planned together with the work: permit to work, lock-out/tag-out, confined space entry and hot work are part of the operating sequence, not a formality to clear before the real work starts.
Scope of work.
- Planning & scheduling in Primavera P6 or Microsoft Project, with multi-level WBS and critical path analysis
- Progress measurement and S-curves for physical and financial progress
- Construction supervision and daily coordination of multiple subcontractors
- Turnaround & shutdown coordination
- Pre-commissioning and commissioning support
- Punch list and close-out
- HSE supervision: permit to work, LOTO, confined spaces, hot work
- Interface with the client’s SAP PM and MM for work orders, notifications and materials
Tools.
| Tool | Use |
|---|---|
| Primavera P6 | Complex projects: multi-level WBS, critical path, S-curves |
| Microsoft Project | Smaller projects and turnaround activities |
| SAP PM / MM | Work orders, maintenance notifications and materials management in your own system |
| AutoCAD | Isometrics, P&IDs, general arrangements, as-built updates |
What you receive.
- Construction plan and project schedule
- Daily and weekly progress reports: physical progress, resources, man-hours, HSE events, open issues
- Interface register, coordination minutes, RACI matrix
- Job Safety Analysis, permit register, incident and near-miss log
- Punch list and completion dossier
Report format is agreed with the client at kick-off, not imposed.